Our Work in Action

Explore Our Portfolio of Completed Projects

Cameron Cove

This project utilizes our H-45,000C-SC-LUS package for guarantied 10/15 effluent for Lafayette Utilities System requirements.

Includes blower building for sound reduction in neighborhood which tested @ 49 decibels with all equipment running.

Charleston Estates

This project was to replace failed oxidation ponds with small footprint 60,000gpd treatment for 10/15 discharge, low decibels, and utilizes our Return Trough System for operator ease and minimized maintenance.

Mobile SBR Projects

Heres a look at our mobile sbr units in action!

Orleans Run

This project features our MTS system for reduced footprint over standard extended aeration for Calcasieu Parish Police Jury. This model can handle loading of 38,000 gpd through 150,000 gpd on a base 75,000 gpd platform. This allows for smaller footprint as well as accommodate long build out times without any equipment change necessary.

Paradise

For this job, we replaced a failed steel system with precast above-ground castings, to match and then exceed previous treatment capacities.

Porters Cove

This project features our expandable series. It started with two 70,000gpd trains and all mechanical equipment , disinfection, monitoring, and accessories to support five trains to achieve 350,000 gpd. Atr the time of this posting the third train tankage is being delivered and install of the final two trains to be installed over the next 3 years keeping pace with the growth of the 700 lot subdivision.

Rapides Colliseum

This project was to resurrect two retired Imhoff systems(100Kgpd and 25Kgpd) by adding our economical hopper style clarifiers to replace the chain rake system and add our blower building with sound control for the close proximity of the neighborhood.

Royal Gardens

This project also was to replace ponds that were no longer capable of producing the required effluent quality and same small footprint and low decibels requirements for 70,000gpd of design flow as well as existing Inflow and Infiltration issues.

Savannah Point

Another LUS guaranteed effluent plant. This is our H-62,500C-SC-LUS model.

CLEDD

This project features our Expandable series for the town of Opelousas, La as an economical option to handle rural incorporated areas that needed Sewer treatment. As shown, it handles 150,000 gpd for 5/5 discharge and with the added future parallel train in the non-limestone area will accommodate 300,000 gpd with existing pre-treatment, filter, chlorinator and post air tankage and equipment.

Pellon Street Plant

This project features our H-150,000C-SC-EX with above grade install to accommodate Hydraulics without the need of effluent lift station. At the time of this posting the third train to expand to 225k gpd is going out for bid.

West Point

This project features our H-150,000C-SC-MTS-LUS for guaranteed effluent criteria of 5 mg/l of BOD, 2 mg/l of ammonia, and 5 mg/l DO. It offers small footprint, minimum decibels, telemetry, digital flow monitoring and recording with aerated sludge digesters and flow paced chlor and de-chlor.